PROJECT:
Center Township Water Intake
DETAILS
Client Name: Center Township Water Authority
Location: Monaca, PA
Delivery Method: Design-build
SF: 24-foot by 55-foot deep concrete caisson, two 300-foot tunnels with intake screens
Cost: $11.1 million
Completion Date: 2017
Engineer: Lennon Smith, Souleret Engineering, Inc.
OVERVIEW
Trumbull constructed a 24-foot diameter by 55-foot deep concrete caisson to support a new submerged river water intake for the Center Township Water Authority. The project included two 300-ft tunnels into the Ohio River with intake screens.
In addition, Trumbull built a full temporary, 21-foot diameter by 35- foot deep caisson out of sheet pile. This included mechanical and electrical appurtenances. Trumbull also installed a 100-foot pipe out into the Ohio River.